Triple

T17567764
Position Surface form Disambiguated ID Type / Status
Subject San Antonio park system E427860 entity
Predicate includes P1393 FINISHED
Object Salado Creek Greenway NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Salado Creek Greenway | Statement: [San Antonio park system, includes, Salado Creek Greenway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Salado Creek Greenway
Context triple: [San Antonio park system, includes, Salado Creek Greenway]
  • A. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • B. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • C. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • D. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • E. South Platte River Greenway
    The South Platte River Greenway is a linear recreational and natural corridor along the South Platte River in Denver, featuring trails, parks, and restored riverfront habitat.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Salado Creek Greenway
Target entity description: Salado Creek Greenway is a linear greenway and trail system in San Antonio that follows Salado Creek, offering recreational paths, natural habitats, and park connections throughout the city.
  • A. Leon Creek Greenway
    Leon Creek Greenway is a multi-use recreational trail and natural corridor in San Antonio that offers walking, running, and cycling paths along the Leon Creek watershed.
  • B. Pistol Creek Greenway
    Pistol Creek Greenway is a multi-use recreational trail and green space in Maryville, Tennessee, that follows Pistol Creek and connects several local parks and community areas.
  • C. Mingo Creek Greenway
    Mingo Creek Greenway is a multi-use recreational trail in Knightdale, North Carolina, offering walking, running, and biking paths along Mingo Creek and connecting to the regional greenway network.
  • D. Camp Creek Greenway
    Camp Creek Greenway is a multi-use recreational trail and green space in Lilburn, Georgia, popular for walking, running, and cycling along Camp Creek.
  • E. South Platte River Greenway
    The South Platte River Greenway is a linear recreational and natural corridor along the South Platte River in Denver, featuring trails, parks, and restored riverfront habitat.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e0385081908a04b66f4dd4bd0d completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e4592e56e481909249b831cecc31d5 completed April 19, 2026, 4:25 a.m.
Created at: April 10, 2026, 5:50 a.m.