Triple

T17550371
Position Surface form Disambiguated ID Type / Status
Subject Gratte-Ciel E427444 entity
Predicate instanceOf P0 FINISHED
Object planned neighborhood C5974 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: planned neighborhood
Context triple: [Gratte-Ciel, instanceOf, planned neighborhood]
  • A. planned residential community chosen
    A planned residential community is a deliberately designed neighborhood or development where housing, infrastructure, amenities, and land use are pre-organized to create a cohesive living environment.
  • B. planned city
    A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
  • C. planned garden city
    A planned garden city is a deliberately designed urban settlement that integrates residential, commercial, and green spaces in a balanced layout to promote healthy living, social cohesion, and environmental sustainability.
  • D. town plan
    A town plan is a comprehensive design that organizes the spatial layout, land use, infrastructure, and public spaces of a town to guide its development and functioning.
  • E. neighborhood
    A neighborhood is a geographically localized community within a larger city or town, characterized by shared residential spaces, social interactions, and common amenities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889df6dc081908f67dbadc03c07ee completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:50 a.m.