Triple

T17519890
Position Surface form Disambiguated ID Type / Status
Subject full-stack-fastapi-template E426656 entity
Predicate instanceOf P0 FINISHED
Object software project template C14645 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: software project template
Context triple: [full-stack-fastapi-template, instanceOf, software project template]
  • A. software development program
    A software development program is an organized set of tools, processes, and educational or operational components designed to plan, create, test, and maintain software applications efficiently and reliably.
  • B. software package
    A software package is a bundled collection of programs, libraries, configuration files, and metadata distributed together to provide specific functionality that can be easily installed, updated, and managed.
  • C. public works project
    A public works project is a government-funded initiative to plan, construct, or maintain infrastructure and facilities that serve the general public’s needs and welfare.
  • D. computer development project chosen
    A computer development project is a structured initiative to design, build, test, and deploy computer-based systems or software to meet specific user or business requirements.
  • E. studio project
    A studio project is a creative, often collaborative, hands-on assignment in a studio-based course where students design, develop, and present work that applies theoretical concepts to practical, real-world or experimental problems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889de677081909b22d2657b1f0292 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:49 a.m.