Triple

T1749931
Position Surface form Disambiguated ID Type / Status
Subject Pratt & Whitney F117-PW-100 E38416 entity
Predicate instanceOf P0 FINISHED
Object high-bypass turbofan C4285 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-bypass turbofan
Context triple: [Pratt & Whitney F117-PW-100, instanceOf, high-bypass turbofan]
  • A. afterburning turbofan engine
    An afterburning turbofan engine is a type of jet engine that combines a turbofan’s efficient core and bypass airflow with an additional combustion stage in the exhaust (afterburner) to provide short-term, significantly increased thrust, typically for military aircraft.
  • B. twin‑engine aircraft
    A twin-engine aircraft is an airplane equipped with two engines, typically mounted on the wings or fuselage, providing increased power, redundancy, and safety compared to single-engine designs.
  • C. turboprop aircraft
    A turboprop aircraft is a fixed-wing airplane powered by one or more gas-turbine engines that drive propellers to provide efficient thrust at low to medium flight speeds.
  • D. jet-powered aircraft
    A jet-powered aircraft is a fixed-wing or VTOL vehicle that generates thrust primarily from one or more jet engines to achieve and sustain flight.
  • E. military aircraft engine chosen
    A military aircraft engine is a high-performance propulsion system designed to power combat and support aircraft, optimized for thrust, reliability, maneuverability, and operation under extreme conditions.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8862bdb2081908aefe831c8aa8017 completed March 4, 2026, 7:21 p.m.
Created at: March 4, 2026, 7:31 p.m.