Triple
T1748689
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Fast & Furious Presents: Hobbs & Shaw |
E38391
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | spin-off film |
C684
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: spin-off film Context triple: [Fast & Furious Presents: Hobbs & Shaw, instanceOf, spin-off film]
-
A.
sequel
A sequel is a narrative work that continues or expands the story, characters, or world of an earlier work, typically set after the events of the original.
-
B.
film franchise
A film franchise is a series of related movies, often sharing characters, settings, or a fictional universe, produced under a common title or brand.
-
C.
film
chosen
A film is a recorded sequence of moving images, often combined with sound, created to tell stories, document events, or convey artistic expression for viewing by an audience.
-
D.
film movement
A film movement is a group of films, filmmakers, or cinematic works from a specific time and place that share common stylistic, thematic, or ideological characteristics and collectively influence the development of cinema.
-
E.
science fiction film
A science fiction film is a motion picture that explores speculative concepts such as advanced technology, space travel, time manipulation, or extraterrestrial life, often examining their impact on individuals and societies.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8862b01a48190ab47209063af82d9 |
completed | March 4, 2026, 7:21 p.m. |
Created at: March 4, 2026, 7:31 p.m.