Triple

T17445967
Position Surface form Disambiguated ID Type / Status
Subject 首都体育馆 E424784 entity
Predicate instanceOf P0 FINISHED
Object 多功能体育场馆 C259 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 多功能体育场馆
Context triple: [首都体育馆, instanceOf, 多功能体育场馆]
  • A. multi-purpose stadium chosen
    A multi-purpose stadium is a large, versatile venue designed to host a variety of events, such as sports games, concerts, and community gatherings, by accommodating different configurations and audiences.
  • B. sports and recreation facility
    A sports and recreation facility is a place designed and equipped for individuals or groups to engage in physical activities, sports, exercise, and leisure pursuits.
  • C. multi-purpose event venue
    A multi-purpose event venue is a flexible space designed to accommodate a wide range of gatherings—such as conferences, concerts, weddings, and exhibitions—by offering adaptable layouts, technical infrastructure, and support services.
  • D. sports-oriented corporate complex
    A sports-oriented corporate complex is a multi-use business facility that integrates office spaces with extensive athletic, fitness, and recreational amenities to promote employee wellness, team-building, and an active corporate culture.
  • E. multi-purpose facility
    A multi-purpose facility is a versatile building or space designed to support a wide range of activities, events, and functions through adaptable layouts and shared resources.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889db0ba481908402409af3b37917 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:47 a.m.