Triple
T17425320
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | La Hague |
E423723
|
entity |
| Predicate | near |
P350
|
FINISHED |
| Object | Orano La Hague nuclear reprocessing plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Orano La Hague nuclear reprocessing plant | Statement: [La Hague, near, Orano La Hague nuclear reprocessing plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Orano La Hague nuclear reprocessing plant Context triple: [La Hague, near, Orano La Hague nuclear reprocessing plant]
-
A.
Nogent-sur-Seine Nuclear Power Plant
Nogent-sur-Seine Nuclear Power Plant is a French nuclear power station in the Aube department featuring pressurized water reactors that supply electricity to the national grid.
-
B.
Flamanville 2 nuclear power plant
Flamanville 2 nuclear power plant is a French pressurized water reactor unit located on the Flamanville nuclear site on the Cotentin Peninsula in Normandy.
-
C.
Flamanville 3 nuclear power plant
Flamanville 3 nuclear power plant is a French EPR (European Pressurized Reactor) project on the Normandy coast, known for its advanced reactor design, major construction delays, and significant cost overruns.
-
D.
Gravelines Nuclear Power Station
Gravelines Nuclear Power Station is a major French nuclear power plant on the North Sea coast, known as one of the largest nuclear generating sites in Western Europe.
-
E.
Northmoor nuclear facility
Northmoor nuclear facility is a secretive and heavily guarded nuclear complex central to the conspiracy in the British political thriller "Edge of Darkness."
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Orano La Hague nuclear reprocessing plant Target entity description: The Orano La Hague nuclear reprocessing plant is a major French industrial facility that treats and recycles spent nuclear fuel, making it one of the largest and most important sites of its kind in the world.
-
A.
Nogent-sur-Seine Nuclear Power Plant
Nogent-sur-Seine Nuclear Power Plant is a French nuclear power station in the Aube department featuring pressurized water reactors that supply electricity to the national grid.
-
B.
Flamanville 2 nuclear power plant
Flamanville 2 nuclear power plant is a French pressurized water reactor unit located on the Flamanville nuclear site on the Cotentin Peninsula in Normandy.
-
C.
Flamanville 3 nuclear power plant
Flamanville 3 nuclear power plant is a French EPR (European Pressurized Reactor) project on the Normandy coast, known for its advanced reactor design, major construction delays, and significant cost overruns.
-
D.
Gravelines Nuclear Power Station
Gravelines Nuclear Power Station is a major French nuclear power plant on the North Sea coast, known as one of the largest nuclear generating sites in Western Europe.
-
E.
Northmoor nuclear facility
Northmoor nuclear facility is a secretive and heavily guarded nuclear complex central to the conspiracy in the British political thriller "Edge of Darkness."
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d88b6081908bada047f5b3ba51 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e448fbfda88190be1c001d64289bf7 |
completed | April 19, 2026, 3:16 a.m. |
Created at: April 10, 2026, 5:46 a.m.