Triple
T17413282
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dunyapur |
E423421
|
entity |
| Predicate | locatedOn |
P40
|
FINISHED |
| Object | Multan–Bahawalpur road corridor |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Multan–Bahawalpur road corridor | Statement: [Dunyapur, locatedOn, Multan–Bahawalpur road corridor]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Multan–Bahawalpur road corridor Context triple: [Dunyapur, locatedOn, Multan–Bahawalpur road corridor]
-
A.
Lahore–Jhang road
The Lahore–Jhang road is a significant regional highway in Pakistan that connects the city of Lahore with Jhang, passing through towns such as Rabwah.
-
B.
Sukkur–Multan Motorway
The Sukkur–Multan Motorway is a major controlled-access highway in Pakistan that forms a key north–south transportation link and a flagship infrastructure project under the China–Pakistan Economic Corridor.
-
C.
Lahore Ring Road
Lahore Ring Road is a major orbital highway encircling Lahore, Pakistan, designed to ease urban congestion and connect key suburbs and transport routes around the city.
-
D.
Peshawar Ring Road
Peshawar Ring Road is a major arterial roadway encircling the city of Peshawar in Pakistan, designed to ease urban congestion and connect key highways and local routes.
-
E.
Peshawar–Islamabad Motorway
The Peshawar–Islamabad Motorway is a major controlled-access highway in Pakistan that links the city of Peshawar with the capital Islamabad, forming a key segment of the country’s national motorway network.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Multan–Bahawalpur road corridor Target entity description: The Multan–Bahawalpur road corridor is a major regional highway link in southern Punjab, Pakistan, connecting key urban centers and facilitating trade and travel between Multan and Bahawalpur.
-
A.
Lahore–Jhang road
The Lahore–Jhang road is a significant regional highway in Pakistan that connects the city of Lahore with Jhang, passing through towns such as Rabwah.
-
B.
Sukkur–Multan Motorway
The Sukkur–Multan Motorway is a major controlled-access highway in Pakistan that forms a key north–south transportation link and a flagship infrastructure project under the China–Pakistan Economic Corridor.
-
C.
Lahore Ring Road
Lahore Ring Road is a major orbital highway encircling Lahore, Pakistan, designed to ease urban congestion and connect key suburbs and transport routes around the city.
-
D.
Peshawar Ring Road
Peshawar Ring Road is a major arterial roadway encircling the city of Peshawar in Pakistan, designed to ease urban congestion and connect key highways and local routes.
-
E.
Peshawar–Islamabad Motorway
The Peshawar–Islamabad Motorway is a major controlled-access highway in Pakistan that links the city of Peshawar with the capital Islamabad, forming a key segment of the country’s national motorway network.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d7d27c819088486ce3f0627fa1 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e43b0c12b881908b2ddc13678c7a75 |
completed | April 19, 2026, 2:16 a.m. |
Created at: April 10, 2026, 5:46 a.m.