Triple

T17407989
Position Surface form Disambiguated ID Type / Status
Subject Perseverance E423269 entity
Predicate onboardComputer P8110 FINISHED
Object RAD750 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RAD750 | Statement: [Perseverance, onboardComputer, RAD750]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RAD750
Context triple: [Perseverance, onboardComputer, RAD750]
  • A. RAD750 chosen
    RAD750 is a radiation-hardened single-board computer widely used in spacecraft and planetary rovers for its reliability in harsh space environments.
  • B. RAD6000
    RAD6000 is a radiation-hardened microprocessor widely used in spacecraft and other spaceborne systems for its reliability in high-radiation environments.
  • C. RADOM-7 (Radiation Monitor)
    RADOM-7 is a spaceborne radiation monitoring instrument used to measure and characterize the radiation environment encountered by spacecraft such as Chandrayaan-1.
  • D. Radox
    Radox is a well-known personal care brand, particularly recognized for its bath and shower products such as bubble baths and shower gels.
  • E. C7500
    The C7500 is a medium-duty commercial truck model in the Chevrolet Kodiak/GMC TopKick series, commonly used for vocational applications like delivery, construction, and utility services.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d7d27c819088486ce3f0627fa1 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e43b08d5a881909e7a5b2ae2c60898 completed April 19, 2026, 2:16 a.m.
Created at: April 10, 2026, 5:46 a.m.