Triple

T1737314
Position Surface form Disambiguated ID Type / Status
Subject 60 Minutes E37947 entity
Predicate openingSequenceFeature P6832 FINISHED
Object ticking stopwatch LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: ticking stopwatch | Statement: [60 Minutes, openingSequenceFeature, ticking stopwatch]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: openingSequenceFeature
Context triple: [60 Minutes, openingSequenceFeature, ticking stopwatch]
  • A. openingInvocation
    Indicates the act of formally beginning an event, process, or sequence through an initiating statement, action, or call.
  • B. openingTheme
    Indicates that one entity serves as the opening theme (such as a song or musical piece) for another entity, typically a show, series, or similar work.
  • C. openingElement chosen
    Indicates that one entity serves as the initial or starting element within a structured sequence, group, or construct in relation to another.
  • D. openingLine
    Indicates that one entity is the first line or initial statement that begins another entity, such as a text, speech, or conversation.
  • E. initialOpening
    Indicates the first or earliest instance in which something is opened, begun, or made accessible.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861cc6ac8190ac0b2e31ccf62851 completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69ab3c2559ac8190905186406fcaccb9 completed March 6, 2026, 8:42 p.m.
PD Predicate disambiguation batch_69aa61c4023c819099cbe439aefda71f completed March 6, 2026, 5:10 a.m.
Created at: March 4, 2026, 7:30 p.m.