Triple

T17357582
Position Surface form Disambiguated ID Type / Status
Subject savings and loan crisis of the 1980s E421978 entity
Predicate totalResolutionCostEstimate P4259 FINISHED
Object around 160 billion U.S. dollars LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: around 160 billion U.S. dollars | Statement: [savings and loan crisis of the 1980s, totalResolutionCostEstimate, around 160 billion U.S. dollars]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: totalResolutionCostEstimate
Context triple: [savings and loan crisis of the 1980s, totalResolutionCostEstimate, around 160 billion U.S. dollars]
  • A. estimatedCost chosen
    Indicates the predicted or calculated monetary amount expected to be required for something, such as a project, item, or action.
  • B. finalCost
    Indicates the total amount to be paid for something after all calculations, such as taxes, discounts, or fees, have been applied.
  • C. economicCost
    Indicates the financial burden, expense, or resource expenditure associated with an action, event, or relationship between entities.
  • D. estimatedCostComment
    Indicates a textual note or explanation associated with an estimated cost, such as rationale, assumptions, or additional details about that estimate.
  • E. constructionCost
    Indicates the monetary or resource expenditure required to build or construct something.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d520008190a26917a95bf1c2ea completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e43a4976788190b00c00f710be6c46 completed April 19, 2026, 2:13 a.m.
PD Predicate disambiguation batch_69e3b02662d08190a07d0fb5c04b6f33 completed April 18, 2026, 4:24 p.m.
Created at: April 10, 2026, 5:44 a.m.