Triple

T17301484
Position Surface form Disambiguated ID Type / Status
Subject Spider-Man 4 (cancelled film project) E420048 entity
Predicate plannedFormat P130 FINISHED
Object theatrical feature film LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: theatrical feature film | Statement: [Spider-Man 4 (cancelled film project), plannedFormat, theatrical feature film]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedFormat
Context triple: [Spider-Man 4 (cancelled film project), plannedFormat, theatrical feature film]
  • A. presentedInFormat
    Indicates that something is expressed, delivered, or made available using a particular format or representation.
  • B. format chosen
    Indicates the specific arrangement, structure, or presentation style in which something is organized or expressed.
  • C. plannedIn
    Indicates that an event, activity, or process is scheduled or arranged to occur within a specific context, timeframe, or plan.
  • D. plannedFrom
    Indicates that something is scheduled or arranged to originate, start, or be derived from a specified source, time, or condition.
  • E. plannedStructure
    Indicates that one entity is a structure that is intended or designed to be built or established in the future, rather than already existing.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886db32608190a61e18862c5a8af6 completed April 10, 2026, 5:12 a.m.
NER Named-entity recognition batch_69e438fae8848190a06c5866e606baac completed April 19, 2026, 2:07 a.m.
PD Predicate disambiguation batch_69e3b0118ad08190b119cd219c68ba67 completed April 18, 2026, 4:23 p.m.
Created at: April 10, 2026, 5:41 a.m.