Triple

T17290503
Position Surface form Disambiguated ID Type / Status
Subject Kirov Factory E419770 entity
Predicate instanceOf P0 FINISHED
Object machine-building plant C4822 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: machine-building plant
Context triple: [Kirov Factory, instanceOf, machine-building plant]
  • A. manufacturing plant
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • B. industrial plant chosen
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • C. production facility
    A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
  • D. tank factory
    A tank factory is an industrial facility where armored combat vehicles are designed, manufactured, assembled, and tested before deployment.
  • E. automobile factory
    An automobile factory is a large-scale industrial facility where raw materials and components are systematically assembled, tested, and finished into complete motor vehicles using coordinated machinery, labor, and production processes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886db32608190a61e18862c5a8af6 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:40 a.m.