Triple

T17265807
Position Surface form Disambiguated ID Type / Status
Subject Arlington Memorial Bridge E419123 entity
Predicate instanceOf P0 FINISHED
Object Neoclassical bridge C38985 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Neoclassical bridge
Context triple: [Arlington Memorial Bridge, instanceOf, Neoclassical bridge]
  • A. 19th-century bridge
    A 19th-century bridge is a transportation structure built during the 1800s that typically reflects the era’s industrial advances in materials and engineering, such as iron, steel, and improved masonry techniques.
  • B. cast-iron bridge
    A cast-iron bridge is a structure whose primary load-bearing elements are made from cast iron, typically featuring modular, prefabricated components assembled to span a gap such as a river or roadway.
  • C. wrought-iron bridge
    A wrought-iron bridge is a structure for spanning physical obstacles, such as rivers or roads, whose primary load-bearing elements are made from wrought iron, valued historically for its toughness, malleability, and resistance to fatigue.
  • D. ornamental bridge
    An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
  • E. stone arch bridge
    A stone arch bridge is a structure composed of curved stone arches that span a gap, using the compressive strength of masonry to support loads and provide passage over obstacles like rivers or valleys.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d9ab108190b70edd8d17aa1204 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:40 a.m.