Triple

T1723760
Position Surface form Disambiguated ID Type / Status
Subject Interstate 94 E37450 entity
Predicate connectsTo P845 FINISHED
Object Interstate 90 in Chicago area E22104 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 90 in Chicago area | Statement: [Interstate 94, connectsTo, Interstate 90 in Chicago area]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 90 in Chicago area
Context triple: [Interstate 94, connectsTo, Interstate 90 in Chicago area]
  • A. Interstate 90 chosen
    Interstate 90 is the longest Interstate Highway in the United States, running east–west from Seattle, Washington, to Boston, Massachusetts.
  • B. Interstate 290
    Interstate 290 is a highway in Massachusetts that serves as a key connector between Worcester and the surrounding regional interstate network.
  • C. Interstate 290
    Interstate 290 is a highway in western New York that serves as a key connector between Buffalo’s suburbs and major regional routes.
  • D. Interstate 294
    Interstate 294 is a major toll highway in the Chicago metropolitan area that forms part of the Tri-State Tollway, carrying traffic around the city and connecting key regional routes.
  • E. Interstate 94
    Interstate 94 is a major east–west U.S. Interstate Highway running from Montana to Michigan, serving key Midwestern cities such as Minneapolis–Saint Paul, Milwaukee, and Chicago.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861acab88190bb43cde203429399 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa635a5c8c8190b3fbf977a93838fd completed March 6, 2026, 5:17 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad8aefefc881908acd48eebc67c6ec completed March 8, 2026, 2:42 p.m.
Created at: March 4, 2026, 7:30 p.m.