Triple

T17204875
Position Surface form Disambiguated ID Type / Status
Subject Burswood Peninsula E417573 entity
Predicate instanceOf P0 FINISHED
Object riverside precinct C1079 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: riverside precinct
Context triple: [Burswood Peninsula, instanceOf, riverside precinct]
  • A. riverside complex
    A riverside complex is a multi-use development situated along a riverbank that typically integrates residential, commercial, recreational, and public spaces designed to engage with the waterfront environment.
  • B. civic precinct
    A civic precinct is a designated urban area that concentrates key public institutions, government buildings, and community spaces to serve as a focal point for civic life and public services.
  • C. waterfront district chosen
    A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
  • D. riverside thoroughfare
    A riverside thoroughfare is a road, path, or promenade that runs alongside a river, facilitating transportation, access, and recreational use of the waterfront.
  • E. lakeside boulevard
    A lakeside boulevard is a scenic, often tree-lined roadway or promenade that runs along the edge of a lake, typically designed for leisurely driving, walking, and recreational enjoyment of waterfront views.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d886d6ba8c819093215917b3d01689 completed April 10, 2026, 5:12 a.m.
Created at: April 10, 2026, 5:38 a.m.