Triple
T17108380
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | I Corps (India) |
E415158
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | strike corps |
C2497
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: strike corps Context triple: [I Corps (India), instanceOf, strike corps]
-
A.
strike committee
A strike committee is a group of workers elected or appointed to organize, coordinate, and represent employees during a strike or labor dispute.
-
B.
specialist corps
A specialist corps is a dedicated group of highly trained experts within a larger organization or system, formed to perform complex, technical, or niche tasks that require advanced, domain-specific skills.
-
C.
military unit
chosen
A military unit is an organized group of armed personnel structured under a defined command hierarchy to perform specific tactical or operational missions.
-
D.
hunter-killer group
A hunter-killer group is a coordinated military formation, typically composed of surface ships, submarines, or aircraft, organized to locate, track, and destroy enemy submarines or other high-value targets.
-
E.
armored regiment
An armored regiment is a military unit equipped primarily with tanks and other armored fighting vehicles, organized to conduct offensive and defensive ground combat operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886d090cc8190a39cb94992586905 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:35 a.m.