Triple

T1707187
Position Surface form Disambiguated ID Type / Status
Subject Engineer Command E36897 entity
Predicate instanceOf P0 FINISHED
Object engineering formation C9652 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: engineering formation
Context triple: [Engineer Command, instanceOf, engineering formation]
  • A. engineering division
    The engineering division is an organizational unit responsible for designing, developing, and maintaining technical systems, products, and infrastructure within a company or institution.
  • B. engineering journal
    An engineering journal is a periodical publication that presents peer-reviewed research, technical developments, and practical applications in various fields of engineering.
  • C. engineering library
    An engineering library is a specialized collection of technical resources, including books, journals, standards, and digital tools, that support research, education, and practice in engineering disciplines.
  • D. engineering examination
    An engineering examination is a formal assessment that evaluates a candidate’s understanding and application of engineering principles, problem-solving skills, and technical knowledge within a specific engineering discipline.
  • E. engineering standard
    An engineering standard is a documented set of agreed-upon technical criteria, methods, and requirements intended to ensure safety, interoperability, quality, and consistency in engineering design, production, and operation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88617439c819094ffb5d16a0f6307 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:30 p.m.