Triple
T17041813
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Blountian tectophase |
E413462
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | tectonic phase |
C31773
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: tectonic phase Context triple: [Blountian tectophase, instanceOf, tectonic phase]
-
A.
tectonic cycle
The tectonic cycle is the continuous process by which Earth's lithospheric plates are created, moved, deformed, and recycled through interactions such as seafloor spreading, subduction, and continental collision.
-
B.
tectonic process
chosen
A tectonic process is a natural geologic mechanism driven by Earth’s internal heat and mantle dynamics that deforms, moves, and reshapes the lithospheric plates over time.
-
C.
tectonic system
A tectonic system is the interconnected set of processes and structures through which Earth’s lithospheric plates move, interact, and reshape the planet’s surface over geological time.
-
D.
tectonic structure
A tectonic structure is a large-scale feature of the Earth's crust, such as faults, folds, or plate boundaries, formed and shaped by the movement and interaction of tectonic plates.
-
E.
tectonic province
A tectonic province is a large region of the Earth's crust characterized by a distinct and relatively uniform structural style, geologic history, and tectonic setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886cd18288190b006abab23f811b7 |
completed | April 10, 2026, 5:12 a.m. |
Created at: April 10, 2026, 5:33 a.m.