Triple
T17035006
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | USS Hornet (CV-12) |
E413296
|
entity |
| Predicate | hullNumber |
P3152
|
FINISHED |
| Object | CV-12 |
E413294
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CV-12 | Statement: [USS Hornet (CV-12), hullNumber, CV-12]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: CV-12 Context triple: [USS Hornet (CV-12), hullNumber, CV-12]
-
A.
CV-12
chosen
CV-12 is the hull number of USS Hornet, a famed U.S. Navy Essex-class aircraft carrier that saw extensive service in World War II and later conflicts.
-
B.
CV-18
CV-18 is the hull classification and pennant number of USS Wasp, an Essex-class aircraft carrier that served in the United States Navy during World War II and the Cold War.
-
C.
CV-13
CV-13 is the hull number of USS Franklin, a U.S. Navy Essex-class aircraft carrier that saw heavy combat and severe damage in the Pacific Theater during World War II.
-
D.
CV-16
CV-16 is the hull designation of USS Lexington, a famed U.S. Navy Essex-class aircraft carrier that saw extensive service in World War II and later became a museum ship.
-
E.
CV-17
CV-17 is the hull number of USS Bunker Hill, a World War II-era Essex-class aircraft carrier of the United States Navy.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d886cd18288190b006abab23f811b7 |
completed | April 10, 2026, 5:12 a.m. |
| NER | Named-entity recognition | batch_69e3d8f05824819091d2aa02e5591e26 |
completed | April 18, 2026, 7:18 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_6a0139ef70208190b26029511e91afb0 |
completed | May 11, 2026, 2:07 a.m. |
Created at: April 10, 2026, 5:33 a.m.