Triple
T1702586
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Mexican Independence Day |
E36800
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | independence day |
C289
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: independence day Context triple: [Mexican Independence Day, instanceOf, independence day]
-
A.
memorial day
Memorial Day is a U.S. federal holiday observed on the last Monday of May to honor and remember military personnel who have died in service to their country.
-
B.
patriot
A patriot is an individual who feels a deep love, loyalty, and commitment to their country, often demonstrated through support, service, or defense of its values and interests.
-
C.
national holiday
chosen
A national holiday is a legally recognized day of celebration or commemoration on which a nation collectively observes significant historical, cultural, or religious events, often with reduced work and school obligations.
-
D.
parade
A parade is a coordinated public procession of people, vehicles, or floats moving along a designated route, typically held to celebrate, commemorate, or promote a particular event, cause, or group.
-
E.
commemorative day
A commemorative day is a designated date set aside to remember, honor, or raise awareness about a specific person, event, cause, or cultural tradition.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88617439c819094ffb5d16a0f6307 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:30 p.m.