Triple

T1689846
Position Surface form Disambiguated ID Type / Status
Subject River Lune E36525 entity
Predicate hasBridge P386 FINISHED
Object M6 motorway Lune Bridge E59106 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M6 motorway Lune Bridge | Statement: [River Lune, hasBridge, M6 motorway Lune Bridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M6 motorway Lune Bridge
Context triple: [River Lune, hasBridge, M6 motorway Lune Bridge]
  • A. M6 motorway chosen
    The M6 motorway is a major north–south route in England, running from the Midlands to the Scottish border and serving as a key part of the UK’s strategic road network.
  • B. M4 motorway
    The M4 motorway is a major west–east route in the United Kingdom linking London with South Wales via key cities such as Reading, Swindon, Bristol and Newport.
  • C. M3 motorway
    The M3 motorway is a major road in southern England that connects London to Southampton, passing through counties including Surrey and Hampshire.
  • D. M74 motorway
    The M74 motorway is a major Scottish motorway forming a key part of the route between Glasgow and the English border, carrying long-distance traffic towards the M6.
  • E. M53 motorway
    The M53 motorway is a major road in north-west England that connects the Wirral Peninsula to the M56 and the wider UK motorway network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a886151508819084fa7f1ce6e05577 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa62979da48190a64a04bf352182e0 completed March 6, 2026, 5:13 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad7992792081909af4312ae8a448a2 completed March 8, 2026, 1:28 p.m.
Created at: March 4, 2026, 7:29 p.m.