Triple

T16890105
Position Surface form Disambiguated ID Type / Status
Subject Rock Island Dam E424145 entity
Predicate isDownstreamOf P5956 FINISHED
Object Wanapum Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Wanapum Dam | Statement: [Rock Island Dam, isDownstreamOf, Wanapum Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Wanapum Dam
Context triple: [Rock Island Dam, isDownstreamOf, Wanapum Dam]
  • A. Wanapum Dam chosen
    Wanapum Dam is a hydroelectric dam on the Columbia River in Washington State that generates power, supports irrigation, and helps regulate river flow.
  • B. Dworshak Dam
    Dworshak Dam is a large concrete gravity dam on the North Fork Clearwater River in Idaho, primarily used for hydroelectric power generation, flood control, and recreation.
  • C. Cle Elum Dam
    Cle Elum Dam is a U.S. Bureau of Reclamation earthfill dam on the Cle Elum River in Washington State that provides irrigation water storage, flood control, and recreation as part of the larger Yakima River basin system.
  • D. Skookumchuck Dam
    Skookumchuck Dam is a hydroelectric and flood-control structure built on the Skookumchuck River in Washington State.
  • E. Leaburg Dam
    Leaburg Dam is a historic hydroelectric dam on Oregon’s McKenzie River that generates power and helps regulate river flow.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889da3e8c8190a2b118f383f0beac completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e3bbc3b5188190ac713b4d4166e961 completed April 18, 2026, 5:13 p.m.
Created at: April 10, 2026, 5:29 a.m.