Triple
T16869157
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Paris–Amsterdam high-speed corridor |
E410123
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | international rail axis |
C20620
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: international rail axis Context triple: [Paris–Amsterdam high-speed corridor, instanceOf, international rail axis]
-
A.
international railway
chosen
An international railway is a rail transport system or route that connects and facilitates the movement of passengers and freight between two or more countries across their national borders.
-
B.
railway network
A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
-
C.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
-
D.
international road
An international road is a major transportation route that connects multiple countries, facilitating cross-border travel and trade by linking national road networks.
-
E.
transport corridor
A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d88395e6c88190b22730f335107c14 |
completed | April 10, 2026, 4:59 a.m. |
Created at: April 10, 2026, 5:24 a.m.