Triple

T16868124
Position Surface form Disambiguated ID Type / Status
Subject Turkish State Railways E410096 entity
Predicate operatesRailLine P15252 FINISHED
Object Ankara–Konya high-speed railway E410097 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ankara–Konya high-speed railway | Statement: [Turkish State Railways, operatesRailLine, Ankara–Konya high-speed railway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ankara–Konya high-speed railway
Context triple: [Turkish State Railways, operatesRailLine, Ankara–Konya high-speed railway]
  • A. Ankara–Konya high-speed railway chosen
    The Ankara–Konya high-speed railway is a major Turkish high-speed rail corridor connecting the capital Ankara with the central Anatolian city of Konya, significantly reducing travel times between the two.
  • B. Ankara–İstanbul high-speed railway
    The Ankara–İstanbul high-speed railway is a major Turkish high-speed rail corridor linking the capital Ankara with the country’s largest city, Istanbul, significantly reducing travel times between the two.
  • C. Konya–Istanbul high-speed railway connection
    The Konya–Istanbul high-speed railway connection is a major Turkish high-speed rail corridor linking the central Anatolian city of Konya with Istanbul, significantly reducing travel times between the two economic and cultural hubs.
  • D. Turkish high-speed rail network
    The Turkish high-speed rail network is a modern intercity rail system that connects major cities across Turkey with fast, electrified train services designed to significantly reduce travel times and improve national mobility.
  • E. Ankara–Eskişehir railway
    The Ankara–Eskişehir railway is a major rail line in central Turkey that connects the capital Ankara with the city of Eskişehir, serving as an important corridor for both passenger and freight transport.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d88395e6c88190b22730f335107c14 completed April 10, 2026, 4:59 a.m.
NER Named-entity recognition batch_69e3b50a82348190b3e33fd558aa3c7f completed April 18, 2026, 4:44 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00c7a27f548190963c35f40f4420f8 completed May 10, 2026, 6 p.m.
Created at: April 10, 2026, 5:24 a.m.