Triple

T1684726
Position Surface form Disambiguated ID Type / Status
Subject Jamaica Center–Parsons/Archer E36416 entity
Predicate instanceOf P0 FINISHED
Object rapid transit terminal C463 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: rapid transit terminal
Context triple: [Jamaica Center–Parsons/Archer, instanceOf, rapid transit terminal]
  • A. rapid transit station chosen
    A rapid transit station is a designated facility where passengers board, alight, and transfer between high-frequency urban rail or metro services, typically featuring platforms, ticketing areas, and access to surrounding streets or other transport modes.
  • B. rapid transit line
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • C. commuter rail station
    A commuter rail station is a designated facility where passengers board and alight regional trains that connect suburbs or outlying areas with urban centers, typically offering platforms, ticketing, and basic passenger amenities.
  • D. airport rail station
    An airport rail station is a transportation facility that directly connects an airport to regional or long-distance rail networks, enabling passengers to transfer efficiently between air and train travel.
  • E. public transit station
    A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a886151508819084fa7f1ce6e05577 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:29 p.m.