Triple

T16783384
Position Surface form Disambiguated ID Type / Status
Subject ARM Mali-G710 MP7 E407908 entity
Predicate intendedProcessNode P124618 FINISHED
Object advanced FinFET nodes (e.g., 5 nm, 6 nm, 7 nm, depending on SoC vendor) LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: advanced FinFET nodes (e.g., 5 nm, 6 nm, 7 nm, depending on SoC vendor) | Statement: [ARM Mali-G710 MP7, intendedProcessNode, advanced FinFET nodes (e.g., 5 nm, 6 nm, 7 nm, depending on SoC vendor)]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: intendedProcessNode
Context triple: [ARM Mali-G710 MP7, intendedProcessNode, advanced FinFET nodes (e.g., 5 nm, 6 nm, 7 nm, depending on SoC vendor)]
  • A. processNode
    Indicates performing an operation or series of operations on a node within a data structure or system.
  • B. keyProcessNode
    Indicates that one node in a process or workflow is designated as a primary or critical step relative to the overall process structure.
  • C. definesProcessFor
    Indicates that one entity specifies or establishes the process or procedure to be used for another entity.
  • D. partOfProcess
    Indicates that one event, step, or action occurs as a component or stage within a larger overall process.
  • E. intendedProgram
    Indicates the academic or training program that an entity plans or expects to pursue, rather than one they are currently enrolled in or have completed.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8839270588190886720d9519bbf8f completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e3b218d31881908d896e688ebd171c completed April 18, 2026, 4:32 p.m.
PD Predicate disambiguation batch_69e319cf691c819083e39225f5777ef0 completed April 18, 2026, 5:42 a.m.
PDg Predicate description generation batch_69e326bac94481908c082117553320f8 completed April 18, 2026, 6:37 a.m.
Created at: April 10, 2026, 5:22 a.m.