Triple
T16754346
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Reserve Component OCS |
E407169
|
entity |
| Predicate | requiresCompletionOf |
P100
|
FINISHED |
| Object | Officer Candidate School curriculum approved by the United States Army |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Officer Candidate School curriculum approved by the United States Army | Statement: [Reserve Component OCS, requiresCompletionOf, Officer Candidate School curriculum approved by the United States Army]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: requiresCompletionOf Context triple: [Reserve Component OCS, requiresCompletionOf, Officer Candidate School curriculum approved by the United States Army]
-
A.
requiredTo
Indicates that one entity has an obligation or necessity to perform an action or satisfy a condition in relation to another entity or context.
-
B.
requires
chosen
Indicates that one entity must exist, occur, or be satisfied before another entity can exist, occur, or be carried out.
-
C.
completedIn
Indicates that an action, process, or task was fully finished within a specified time period or duration.
-
D.
requiredOn
Indicates that one entity must exist, be present, or be fulfilled on a specific other entity, date, or condition as a mandatory requirement.
-
E.
isCompleteOn
Indicates that an activity, task, or process has been fully finished or achieved by a specific point in time or on a specific date.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8839174188190909f190097207065 |
completed | April 10, 2026, 4:58 a.m. |
| NER | Named-entity recognition | batch_69e3abe6b68c8190a5e2a11973f01b8e |
completed | April 18, 2026, 4:05 p.m. |
| PD | Predicate disambiguation | batch_69e319cbd79c8190a03587a61c18bec0 |
completed | April 18, 2026, 5:42 a.m. |
Created at: April 10, 2026, 5:21 a.m.