Triple

T1673813
Position Surface form Disambiguated ID Type / Status
Subject Eccles tram stop E36184 entity
Predicate servedByLine P1293 FINISHED
Object Eccles Line E13301 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Eccles Line | Statement: [Eccles tram stop, servedByLine, Eccles Line]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Eccles Line
Context triple: [Eccles tram stop, servedByLine, Eccles Line]
  • A. Eccles Line chosen
    The Eccles Line is a light rail route on Greater Manchester's Metrolink network that connects Manchester city centre with the suburb of Eccles via Salford Quays and MediaCityUK.
  • B. Styal Line
    The Styal Line is a suburban railway route in Greater Manchester, England, connecting central Manchester with Manchester Airport and surrounding areas.
  • C. Newcastle Line
    The Newcastle Line is a suburban and intercity railway corridor in New South Wales, Australia, serving the city of Newcastle and connecting it with surrounding regions.
  • D. Avon Valley Line
    The Avon Valley Line is a railway route in southwest England that follows the River Avon, connecting key towns and cities in the region.
  • E. Bathgate Line
    The Bathgate Line is a Scottish railway route connecting Edinburgh with the town of Bathgate and other communities in West Lothian.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861286808190939afff3ce8ee31e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa6246753081909dace4eacf9cb1c0 completed March 6, 2026, 5:12 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad798b0f1c81908174b312878e559b completed March 8, 2026, 1:28 p.m.
Created at: March 4, 2026, 7:29 p.m.