Triple

T16727661
Position Surface form Disambiguated ID Type / Status
Subject Columbus laboratory E406502 entity
Predicate controlCenter P18611 FINISHED
Object Columbus Control Centre E386259 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Columbus Control Centre | Statement: [Columbus laboratory, controlCenter, Columbus Control Centre]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Columbus Control Centre
Context triple: [Columbus laboratory, controlCenter, Columbus Control Centre]
  • A. DLR Columbus Control Center chosen
    The DLR Columbus Control Center is the German Aerospace Center’s mission control facility responsible for operating and monitoring the European Columbus laboratory module on the International Space Station.
  • B. CSA Mission Control Centre
    The CSA Mission Control Centre is the Canadian Space Agency’s facility responsible for overseeing and supporting Canada’s contributions to human spaceflight and International Space Station operations.
  • C. Mission Control Centre
    The Mission Control Centre is the primary command and monitoring hub for managing and overseeing rocket launches and space missions at the Satish Dhawan Space Centre.
  • D. Goddard Spacecraft Operations Control Center
    The Goddard Spacecraft Operations Control Center is NASA’s primary facility at the Goddard Space Flight Center for monitoring, commanding, and managing the operations of numerous Earth-orbiting and deep-space spacecraft.
  • E. Kennedy Space Center Launch Control Center
    The Kennedy Space Center Launch Control Center is NASA’s primary facility for managing and overseeing countdown and launch operations for rockets departing from Florida’s Kennedy Space Center.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838f242881908abd8bc138795886 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e38748f538819097de1fdee9b42f34 completed April 18, 2026, 1:29 p.m.
NED1 Entity disambiguation (via context triple) batch_6a009d483a8c8190b127f32dcc21be5a completed May 10, 2026, 2:59 p.m.
Created at: April 10, 2026, 5:20 a.m.