Triple

T16723865
Position Surface form Disambiguated ID Type / Status
Subject Bozova E406417 entity
Predicate hasInfrastructureNearby P5648 FINISHED
Object Atatürk Dam E87178 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Atatürk Dam | Statement: [Bozova, hasInfrastructureNearby, Atatürk Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Atatürk Dam
Context triple: [Bozova, hasInfrastructureNearby, Atatürk Dam]
  • A. Atatürk Dam chosen
    Atatürk Dam is one of Turkey’s largest and most significant hydroelectric and irrigation dams, forming a key part of the Southeastern Anatolia Project on the Euphrates River.
  • B. Aslantaş Dam
    Aslantaş Dam is a major rock-fill embankment dam on the Ceyhan River in southern Turkey, primarily used for irrigation, flood control, and hydroelectric power generation.
  • C. Ertan Dam
    Ertan Dam is a major arch dam and hydroelectric power station in Sichuan, China, known for its large installed capacity and role in regional power generation.
  • D. Keban Dam
    Keban Dam is a major hydroelectric and flood-control dam in eastern Turkey that forms one of the largest reservoirs on the Euphrates River.
  • E. Aras Dam
    Aras Dam is a major hydroelectric and irrigation dam on the transboundary Aras River, playing a key role in water management and power generation in the region between Iran and the South Caucasus.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838f242881908abd8bc138795886 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e38745d2048190b476e5aa83ec7fec completed April 18, 2026, 1:29 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00a518019881909a7c5ef344966579 completed May 10, 2026, 3:32 p.m.
Created at: April 10, 2026, 5:20 a.m.