Triple
T1668649
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Data Control Language |
E36072
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | SQL sublanguage |
C3279
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: SQL sublanguage Context triple: [Data Control Language, instanceOf, SQL sublanguage]
-
A.
database language
chosen
A database language is a specialized computer language used to define, manipulate, query, and control data and structures within a database management system.
-
B.
query language
A query language is a specialized computer language used to request, filter, and manipulate data from databases or information systems.
-
C.
RDBMS
An RDBMS (Relational Database Management System) is software that stores, organizes, and manages data in structured tables with defined relationships, enabling efficient querying, updating, and administration using SQL.
-
D.
programmatic statement
A programmatic statement is a high-level declaration that outlines the intended goals, guiding principles, and planned actions of a system, organization, or initiative in a structured, often formalized manner.
-
E.
subcommunity
A subcommunity is a smaller, more specialized group of individuals within a larger community who share specific interests, characteristics, or goals that distinguish them from the broader whole.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8861286808190939afff3ce8ee31e |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:29 p.m.