Triple

T1666063
Position Surface form Disambiguated ID Type / Status
Subject Shanghai International Circuit E36014 entity
Predicate instanceOf P0 FINISHED
Object Formula One circuit C9025 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Formula One circuit
Context triple: [Shanghai International Circuit, instanceOf, Formula One circuit]
  • A. Formula One Grand Prix
    A Formula One Grand Prix is a premier international motor racing event, held on a designated circuit or street track, where teams and drivers compete in highly engineered single-seater cars for championship points.
  • B. racing driver
    A racing driver is a professional or amateur competitor who operates high-performance vehicles at speed in organized motorsport events, applying advanced driving skills, strategy, and physical endurance to achieve the fastest possible lap times and race results.
  • C. Grand Tour
    A Grand Tour is an extended, often multi-destination journey undertaken for cultural enrichment, education, and personal growth through immersive travel experiences.
  • D. stage race
    A stage race is a multi-day cycling competition composed of several individual races (stages), with overall rankings determined by cumulative time or points across all stages.
  • E. racetrack brand
    A racetrack brand is a conceptual class representing the identity, image, and distinguishing attributes (such as name, logo, reputation, and target audience) associated with a specific motorsport racing venue or series.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8861286808190939afff3ce8ee31e completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:29 p.m.