Triple
T1665720
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nanjing Road |
E36007
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | commercial street |
C405
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: commercial street Context triple: [Nanjing Road, instanceOf, commercial street]
-
A.
shopping street
chosen
A shopping street is a public thoroughfare lined with a variety of retail stores, services, and eateries designed for pedestrian access and commercial activity.
-
B.
urban promenade
An urban promenade is a designed public walkway or boulevard in a city, intended for leisurely strolling, social interaction, and visual enjoyment of the surrounding urban landscape.
-
C.
street
A street is a public thoroughfare in an urban or suburban area, typically bordered by buildings, that facilitates vehicular and pedestrian movement and often supports various social and commercial activities.
-
D.
urban business district
An urban business district is a densely developed area within a city characterized by a high concentration of offices, commercial activities, financial institutions, and supporting services that form the economic core of the urban environment.
-
E.
avenue
An avenue is a broad, often tree-lined street or thoroughfare designed to accommodate significant vehicular and pedestrian traffic within an urban or suburban area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8861286808190939afff3ce8ee31e |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:29 p.m.