Triple

T16652494
Position Surface form Disambiguated ID Type / Status
Subject Taipei Metro Bannan Line E404640 entity
Predicate instanceOf P0 FINISHED
Object heavy rail metro line C640 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: heavy rail metro line
Context triple: [Taipei Metro Bannan Line, instanceOf, heavy rail metro line]
  • A. rapid transit line chosen
    A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
  • B. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • C. rapid transit line segment
    A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
  • D. monorail transit line
    A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
  • E. rapid transit network
    A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8838a41f08190b0c3f79c47df5078 completed April 10, 2026, 4:58 a.m.
Created at: April 10, 2026, 5:18 a.m.