Triple
T16652494
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Taipei Metro Bannan Line |
E404640
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | heavy rail metro line |
C640
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: heavy rail metro line Context triple: [Taipei Metro Bannan Line, instanceOf, heavy rail metro line]
-
A.
rapid transit line
chosen
A rapid transit line is a high-capacity, high-frequency urban rail route operating on an exclusive or mostly separated right-of-way to provide fast, reliable public transportation between key areas of a city or metropolitan region.
-
B.
light rail transit line
A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
-
C.
rapid transit line segment
A rapid transit line segment is a contiguous portion of a rapid transit route between two defined points (such as stations, junctions, or terminals) that carries high-frequency, high-capacity passenger rail service.
-
D.
monorail transit line
A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
-
E.
rapid transit network
A rapid transit network is an integrated system of high-capacity, high-frequency urban rail or bus lines designed to move large numbers of passengers quickly and efficiently across a metropolitan area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8838a41f08190b0c3f79c47df5078 |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:18 a.m.