Triple
T1658613
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tehran Metro |
E35854
|
entity |
| Predicate | hasSuburbanLine |
P17559
|
FINISHED |
| Object | Tehran Metro Line 8 |
E189010
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tehran Metro Line 8 | Statement: [Tehran Metro, hasSuburbanLine, Tehran Metro Line 8]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Tehran Metro Line 8 Context triple: [Tehran Metro, hasSuburbanLine, Tehran Metro Line 8]
-
A.
Tehran Metro Line 8
chosen
Tehran Metro Line 8 is a planned or operational rapid transit line within the Tehran Metro system, serving as part of the urban rail network in Iran’s capital.
-
B.
Tehran Metro Line 9
Tehran Metro Line 9 is a planned rapid transit line intended to expand and improve the urban rail network in Iran’s capital, Tehran.
-
C.
Tehran Metro
Tehran Metro is the rapid transit system serving Iran’s capital, providing extensive urban and suburban rail transport across the Tehran metropolitan area.
-
D.
Tehran Bus Rapid Transit
Tehran Bus Rapid Transit is a dedicated-lane bus network in Iran’s capital that provides high-capacity, rapid public transportation across major urban corridors.
-
E.
Tajrish Metro Station
Tajrish Metro Station is a major northern terminus of Tehran’s metro network, serving as a key transit hub for commuters and visitors in the Tajrish area.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a88606aa808190aa0b421b4271f220 |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69aa61e142ac8190aa2fbd8f0826b5b2 |
completed | March 6, 2026, 5:10 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad8abe91bc8190ba363e1f7fd07b9f |
completed | March 8, 2026, 2:42 p.m. |
Created at: March 4, 2026, 7:29 p.m.