Triple
T16532750
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cheriton Terminal |
E401608
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Channel Tunnel terminal |
C37592
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Channel Tunnel terminal Context triple: [Cheriton Terminal, instanceOf, Channel Tunnel terminal]
-
A.
Transilien station
A Transilien station is a railway facility in the Île-de-France region that serves suburban and regional commuter trains operated under the Transilien network, providing passenger access, ticketing, and related services.
-
B.
Overground station
An overground station is a railway or transit facility located at or above ground level where passengers board, alight, and transfer between surface-level trains or transit services.
-
C.
tram station
A tram station is a designated stopping place along a tram line where passengers can safely board, alight, and sometimes transfer between tram services.
-
D.
rail tunnel
A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
-
E.
railway bridge terminus
A railway bridge terminus is the endpoint of a rail line where tracks transition from or onto a bridge structure, often incorporating platforms, signaling, and facilities for train arrival, departure, and turnaround.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d883838abc8190bc79cb2d41733ce2 |
completed | April 10, 2026, 4:58 a.m. |
Created at: April 10, 2026, 5:15 a.m.