Triple

T165079
Position Surface form Disambiguated ID Type / Status
Subject Great Lakes Works E2996 entity
Predicate instanceOf P0 FINISHED
Object steel manufacturing plant C240 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: steel manufacturing plant
Context triple: [Great Lakes Works, instanceOf, steel manufacturing plant]
  • A. steelmaking process
    The steelmaking process is an industrial sequence of operations that transforms iron ore and scrap into refined steel by removing impurities, adjusting chemical composition, and controlling temperature and structure to achieve desired material properties.
  • B. manufacturing company
    A manufacturing company is an organization that transforms raw materials or components into finished goods through industrial processes, machinery, and labor for sale to other businesses or consumers.
  • C. metallurgical process
    A metallurgical process is a series of physical and chemical operations used to extract, refine, and shape metals from their ores or recycled materials into usable forms with desired properties.
  • D. steel arch bridge
    A steel arch bridge is a structure that uses a curved steel arch as its main load-bearing element to span a distance and support traffic above.
  • E. building chosen
    A building is a constructed, often multi-level structure designed to provide shelter, space, and functional environments for human activities such as living, working, or storing goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a2524ce1e48190ab066bf72859f474 completed Feb. 28, 2026, 2:26 a.m.
Created at: Feb. 28, 2026, 2:34 a.m.