Triple

T1650408
Position Surface form Disambiguated ID Type / Status
Subject Guangzhou Metro E35677 entity
Predicate hasLine P35 FINISHED
Object Line 8
Line 8 is a rapid transit line of the Guangzhou Metro system in Guangzhou, China, serving as one of the city's key urban rail corridors.
E187937 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 8 | Statement: [Guangzhou Metro, hasLine, Line 8]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 8
Context triple: [Guangzhou Metro, hasLine, Line 8]
  • A. Line 8
    Line 8 is a route of Mexico City’s Metrobús bus rapid transit system, serving key corridors with dedicated lanes and station platforms.
  • B. Line 8
    Line 8 is a line of the Mexico City Metro system that runs in a generally north–south direction, connecting key residential and commercial areas of the city.
  • C. Line 8
    Line 8 is a rapid transit line of the Beijing Subway system that serves key central and northern districts of Beijing.
  • D. Line 7
    Line 7 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • E. Line 7
    Line 7 is an east–west rapid transit line of the Beijing Subway serving several central and southwestern districts of Beijing.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Line 8
Triple: [Guangzhou Metro, hasLine, Line 8]
Generated description
Line 8 is a rapid transit line of the Guangzhou Metro system in Guangzhou, China, serving as one of the city's key urban rail corridors.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Line 8
Target entity description: Line 8 is a rapid transit line of the Guangzhou Metro system in Guangzhou, China, serving as one of the city's key urban rail corridors.
  • A. Line 8
    Line 8 is a route of Mexico City’s Metrobús bus rapid transit system, serving key corridors with dedicated lanes and station platforms.
  • B. Line 8
    Line 8 is a rapid transit line of the Beijing Subway system that serves key central and northern districts of Beijing.
  • C. Line 8
    Line 8 is a line of the Mexico City Metro system that runs in a generally north–south direction, connecting key residential and commercial areas of the city.
  • D. Line 7
    Line 7 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • E. Line 7
    Line 7 is an east–west rapid transit line of the Beijing Subway serving several central and southwestern districts of Beijing.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8860568888190a32cd9f70acbba42 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a90a66b58c819082d38ef1c805cf44 completed March 5, 2026, 4:45 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad681db3408190a3b469e319486419 completed March 8, 2026, 12:14 p.m.
NEDg Description generation batch_69ad692a4078819080c3a89166917081 completed March 8, 2026, 12:18 p.m.
NED2 Entity disambiguation (via description) batch_69ad698929f88190af97fc915d29a5b5 completed March 8, 2026, 12:20 p.m.
Created at: March 4, 2026, 7:29 p.m.