Triple

T1650405
Position Surface form Disambiguated ID Type / Status
Subject Guangzhou Metro E35677 entity
Predicate hasLine P35 FINISHED
Object Line 5
Line 5 is a major east–west rapid transit route in the Guangzhou Metro system, serving key urban districts and facilitating high-capacity cross-city travel.
E190886 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Line 5 | Statement: [Guangzhou Metro, hasLine, Line 5]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Line 5
Context triple: [Guangzhou Metro, hasLine, Line 5]
  • A. Line 5
    Line 5 is one of the main lines of the Santiago Metro in Chile, running across several key districts and serving as a major east–west transit corridor in the city.
  • B. Line 5
    Line 5 is a major north–south route of the Beijing Subway known for connecting key residential and commercial areas through the city center.
  • C. Line 5
    Line 5 is one of the lines of the Mexico City Metro system, serving multiple stations across the city as part of its rapid transit network.
  • D. Line 5
    Line 5 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • E. Line 4
    Line 4 is a major line of the Santiago Metro in Chile, serving key residential and commercial areas in the southeastern part of the city.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Line 5
Triple: [Guangzhou Metro, hasLine, Line 5]
Generated description
Line 5 is a major east–west rapid transit route in the Guangzhou Metro system, serving key urban districts and facilitating high-capacity cross-city travel.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Line 5
Target entity description: Line 5 is a major east–west rapid transit route in the Guangzhou Metro system, serving key urban districts and facilitating high-capacity cross-city travel.
  • A. Line 5
    Line 5 is a route of Mexico City’s Metrobús bus rapid transit system that serves key corridors with dedicated lanes and high-capacity articulated buses.
  • B. Line 5
    Line 5 is one of the main lines of the Santiago Metro in Chile, running across several key districts and serving as a major east–west transit corridor in the city.
  • C. Line 5
    Line 5 is a major north–south route of the Beijing Subway known for connecting key residential and commercial areas through the city center.
  • D. Line 5
    Line 5 is one of the lines of the Mexico City Metro system, serving multiple stations across the city as part of its rapid transit network.
  • E. Line 4
    Line 4 is a major line of the Santiago Metro in Chile, serving key residential and commercial areas in the southeastern part of the city.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8860568888190a32cd9f70acbba42 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a90a66b58c819082d38ef1c805cf44 completed March 5, 2026, 4:45 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad79847cbc8190be99c66424034bce completed March 8, 2026, 1:28 p.m.
NEDg Description generation batch_69ad7a1223fc8190b7d62217c17f7517 completed March 8, 2026, 1:30 p.m.
NED2 Entity disambiguation (via description) batch_69ad7b0787c88190a59a815fa808ac6b completed March 8, 2026, 1:35 p.m.
Created at: March 4, 2026, 7:29 p.m.