Triple

T16484381
Position Surface form Disambiguated ID Type / Status
Subject Orano E400399 entity
Predicate hasMajorSite P5003 FINISHED
Object Tricastin nuclear site E242868 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Tricastin nuclear site | Statement: [Orano, hasMajorSite, Tricastin nuclear site]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Tricastin nuclear site
Context triple: [Orano, hasMajorSite, Tricastin nuclear site]
  • A. Nogent-sur-Seine Nuclear Power Plant
    Nogent-sur-Seine Nuclear Power Plant is a French nuclear power station in the Aube department featuring pressurized water reactors that supply electricity to the national grid.
  • B. Tricastin chosen
    Tricastin is a historical and wine-producing region in southeastern France, known for its vineyards and the nearby Tricastin Nuclear Power Plant.
  • C. CEA Marcoule
    CEA Marcoule is a major French nuclear research and industrial site focused on nuclear energy technologies, fuel cycle activities, and radioactive waste management.
  • D. Fessenheim
    Fessenheim is a commune in northeastern France near the Rhine River, known for its major hydroelectric power station and former nuclear power plant.
  • E. Flamanville 3 nuclear power plant
    Flamanville 3 nuclear power plant is a French EPR (European Pressurized Reactor) project on the Normandy coast, known for its advanced reactor design, major construction delays, and significant cost overruns.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d883813098819084f5409539723b59 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e32e05bf448190947b9da15fd29d0a completed April 18, 2026, 7:08 a.m.
NED1 Entity disambiguation (via context triple) batch_6a005820790c819088d953eeea09328d completed May 10, 2026, 10:04 a.m.
Created at: April 10, 2026, 5:13 a.m.