Subject Flamanville 3 nuclear power plant E400397 entity
Predicate gridOperator P16162 FINISHED
Object RTE (Réseau de Transport d’Électricité) E644897 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: RTE (Réseau de Transport d’Électricité) | Statement: [Flamanville 3 nuclear power plant, gridOperator, RTE (Réseau de Transport d’Électricité)]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: RTE (Réseau de Transport d’Électricité)
Context triple: [Flamanville 3 nuclear power plant, gridOperator, RTE (Réseau de Transport d’Électricité)]
  • A. Réseau de Transport d’Électricité chosen
    Réseau de Transport d’Électricité (RTE) is the French transmission system operator responsible for managing and maintaining France’s high-voltage electricity grid and ensuring the balance between power supply and demand.
  • B. ENTSO-E
    ENTSO-E is the European Network of Transmission System Operators for Electricity, a body that coordinates and represents electricity transmission system operators across Europe to ensure reliable and efficient power system operation and market integration.
  • C. Eurelectric
    Eurelectric is the pan-European industry association representing the interests of the electricity sector and power companies across Europe.
  • D. Tractebel Energia
    Tractebel Energia is a Brazilian electric power generation company known for operating large hydroelectric facilities and other energy assets across the country.
  • E. Enedis
    Enedis is the French electricity distribution network operator responsible for managing and maintaining most of France’s public power grid.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d883813098819084f5409539723b59 completed April 10, 2026, 4:58 a.m.
NER Named-entity recognition batch_69e32e05bf448190947b9da15fd29d0a completed April 18, 2026, 7:08 a.m.
NED1 Entity disambiguation (via context triple) batch_6a005820790c819088d953eeea09328d completed May 10, 2026, 10:04 a.m.
Created at: April 10, 2026, 5:13 a.m.