Triple
T1647598
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | M |
E35617
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | domain-specific language |
C1703
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: domain-specific language Context triple: [M, instanceOf, domain-specific language]
-
A.
programming language
chosen
A programming language is a formal system of syntax and semantics that allows humans to write instructions a computer can execute to perform specific tasks or solve problems.
-
B.
metalanguage
A metalanguage is a language or formal system used to describe, analyze, or define another language (the object language), including its syntax, semantics, and rules.
-
C.
Knowledge representation language
A knowledge representation language is a formal system used to encode information about the world in a structured, machine-interpretable way so that computers can reason about it.
-
D.
database language
A database language is a specialized computer language used to define, manipulate, query, and control data and structures within a database management system.
-
E.
programming language specification
A programming language specification is a formal document that precisely defines a language’s syntax, semantics, and behavior to ensure consistent implementation and usage across tools and platforms.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a8860568888190a32cd9f70acbba42 |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:29 p.m.