Triple

T1646145
Position Surface form Disambiguated ID Type / Status
Subject Village of Westmont E35585 entity
Predicate hasMajorRoad P385 FINISHED
Object Interstate 88 E164684 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 88 | Statement: [Village of Westmont, hasMajorRoad, Interstate 88]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 88
Context triple: [Village of Westmont, hasMajorRoad, Interstate 88]
  • A. Interstate 88 chosen
    Interstate 88 is a major east–west highway in Illinois that connects the Chicago metropolitan area with the Quad Cities and serves as a key regional transportation corridor.
  • B. Interstate 74
    Interstate 74 is a major east–west U.S. Interstate Highway that runs through multiple Midwestern and Southeastern states, including a segment in North Carolina.
  • C. Interstate 82
    Interstate 82 is a major U.S. highway in the Pacific Northwest that connects central Washington to northeastern Oregon, facilitating regional travel and commerce.
  • D. Interstate 94
    Interstate 94 is a major east–west U.S. Interstate Highway running from Montana to Michigan, serving key Midwestern cities such as Minneapolis–Saint Paul, Milwaukee, and Chicago.
  • E. Interstate 185
    Interstate 185 is a spur route of Interstate 85 in western Georgia that connects the Columbus area to the main interstate network.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88604618c81908b41f6429c431eb6 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a90a62b26c8190bf97bb80c228b47e completed March 5, 2026, 4:45 a.m.
NED1 Entity disambiguation (via context triple) batch_69c9008bdbd4819082fd91ded34d5bbb completed March 29, 2026, 10:35 a.m.
Created at: March 4, 2026, 7:28 p.m.