Triple

T1639105
Position Surface form Disambiguated ID Type / Status
Subject STS-88 E35426 entity
Predicate instanceOf P0 FINISHED
Object Space Shuttle Endeavour mission C5891 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Space Shuttle Endeavour mission
Context triple: [STS-88, instanceOf, Space Shuttle Endeavour mission]
  • A. Space Shuttle mission chosen
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • B. SpaceX mission
    A SpaceX mission is a coordinated aerospace operation conducted by SpaceX to transport payloads or crew to specific destinations in space, such as Earth orbit, the International Space Station, or beyond.
  • C. NASA space mission
    A NASA space mission is a coordinated, goal-driven endeavor planned and executed by NASA to explore, observe, or utilize space using specialized spacecraft, instruments, and supporting ground operations.
  • D. space mission
    A space mission is a planned and coordinated endeavor to send spacecraft, instruments, or humans beyond Earth's atmosphere to achieve specific scientific, exploratory, commercial, or technological objectives.
  • E. crewed spaceflight mission
    A crewed spaceflight mission is an organized operation that sends humans into space to perform specific scientific, exploratory, operational, or technological objectives before safely returning them to Earth or another destination.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a88604618c81908b41f6429c431eb6 completed March 4, 2026, 7:20 p.m.
Created at: March 4, 2026, 7:28 p.m.