Triple

T16360422
Position Surface form Disambiguated ID Type / Status
Subject Angat E397295 entity
Predicate isNear P350 FINISHED
Object Angat Dam E940804 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Angat Dam | Statement: [Angat, isNear, Angat Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Angat Dam
Context triple: [Angat, isNear, Angat Dam]
  • A. Angat Dam chosen
    Angat Dam is a major concrete water reservoir and hydroelectric facility in Bulacan, Philippines, that supplies much of Metro Manila’s potable water and power.
  • B. Bayano Dam
    Bayano Dam is a major hydroelectric dam in Panama that impounds the Bayano River to form Bayano Lake and supply power to the country.
  • C. Pangue Dam
    Pangue Dam is a major hydroelectric power facility in Chile, built on the Biobío River to generate electricity and support the country’s energy needs.
  • D. Macagua Dam
    Macagua Dam is a major hydroelectric dam complex in Venezuela that forms part of the Guri–Macagua–Caruachi system generating power from the Caroní River.
  • E. Nangbeto Dam
    Nangbeto Dam is a hydroelectric and irrigation dam on the Mono River in West Africa, jointly developed by Togo and Benin to generate power and support regional water management.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f2778dc8190aa95c7572db127e6 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e2fad241848190a9f32c7b050f20a5 completed April 18, 2026, 3:30 a.m.
NED1 Entity disambiguation (via context triple) batch_6a00355df6188190929be8584b5ac87e completed May 10, 2026, 7:35 a.m.
Created at: April 10, 2026, 5:08 a.m.