Triple

T16333446
Position Surface form Disambiguated ID Type / Status
Subject Condit Dam E396612 entity
Predicate operator P179 FINISHED
Object PacifiCorp E313808 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PacifiCorp | Statement: [Condit Dam, operator, PacifiCorp]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PacifiCorp
Context triple: [Condit Dam, operator, PacifiCorp]
  • A. PacifiCorp chosen
    PacifiCorp is a major U.S. electric utility company serving customers across several Western states.
  • B. Idaho Power Company
    Idaho Power Company is a U.S. electric utility based in the Pacific Northwest, known for generating and distributing hydroelectric power along the Snake River and surrounding regions.
  • C. Bonneville Power Administration
    Bonneville Power Administration is a U.S. federal agency that markets and transmits electric power, primarily from hydroelectric dams in the Pacific Northwest.
  • D. Great Western Power Company
    Great Western Power Company was an early 20th-century California electric utility company known for developing hydroelectric projects and infrastructure in the Sierra Nevada region.
  • E. Columbia Power Corporation
    Columbia Power Corporation is a British Columbia Crown corporation that develops, owns, and operates hydroelectric power projects in the Columbia River Basin.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f255b788190a400eba031dd85d8 completed April 10, 2026, 4:40 a.m.
NER Named-entity recognition batch_69e2c4e1da1081909bec6e77e6109dce completed April 17, 2026, 11:40 p.m.
NED1 Entity disambiguation (via context triple) batch_6a0026173dc081909e00f6647d1f68b3 completed May 10, 2026, 6:30 a.m.
Created at: April 10, 2026, 5:07 a.m.