Triple

T16206971
Position Surface form Disambiguated ID Type / Status
Subject Yui Rail E393352 entity
Predicate instanceOf P0 FINISHED
Object urban monorail system C8883 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban monorail system
Context triple: [Yui Rail, instanceOf, urban monorail system]
  • A. monorail transit line
    A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
  • B. monorail-served city
    A monorail-served city is an urban area whose public transportation network prominently features one or more elevated monorail lines that provide regular passenger service and integrate with the city’s overall mobility system.
  • C. urban rail loop line
    An urban rail loop line is a circular or near-circular transit route within a city that connects multiple districts and intersecting lines, allowing continuous, bidirectional travel without a terminal endpoint.
  • D. monorail line chosen
    A monorail line is a guided transit route where trains run on a single rail or beam, typically elevated, providing efficient and often automated urban or interurban transportation.
  • E. streetcar system
    A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1f5bd08190bd01cac0d5b9d2ef completed April 10, 2026, 4:39 a.m.
Created at: April 10, 2026, 5:03 a.m.