Triple

T16197544
Position Surface form Disambiguated ID Type / Status
Subject Gudvangen E393104 entity
Predicate hasNearbyTunnel P29183 FINISHED
Object Flenja Tunnel
Flenja Tunnel is a road tunnel in western Norway located near the village of Gudvangen in the scenic Nærøyfjord area.
E1198765 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Flenja Tunnel | Statement: [Gudvangen, hasNearbyTunnel, Flenja Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Flenja Tunnel
Context triple: [Gudvangen, hasNearbyTunnel, Flenja Tunnel]
  • A. Kohat Tunnel
    Kohat Tunnel is a major road tunnel in Pakistan that provides a vital transport link through the mountainous terrain between Kohat and Peshawar in Khyber Pakhtunkhwa.
  • B. Bu Tunnel
    Bu Tunnel is a Norwegian road tunnel that forms part of the access route to the Hardanger Bridge in Vestland county.
  • C. Vallavik Tunnel
    Vallavik Tunnel is a road tunnel in western Norway that forms part of the regional highway network connecting to the Hardanger Bridge.
  • D. Gudvanga Tunnel
    Gudvanga Tunnel is a major road tunnel in western Norway, known as one of the country's longest tunnels and a key part of the E16 route through the fjord region.
  • E. Drogden Tunnel
    The Drogden Tunnel is an underwater road and rail tunnel beneath the Øresund Strait that forms the submerged section of the fixed link between Denmark and Sweden.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Flenja Tunnel
Triple: [Gudvangen, hasNearbyTunnel, Flenja Tunnel]
Generated description
Flenja Tunnel is a road tunnel in western Norway located near the village of Gudvangen in the scenic Nærøyfjord area.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Flenja Tunnel
Target entity description: Flenja Tunnel is a road tunnel in western Norway located near the village of Gudvangen in the scenic Nærøyfjord area.
  • A. Kohat Tunnel
    Kohat Tunnel is a major road tunnel in Pakistan that provides a vital transport link through the mountainous terrain between Kohat and Peshawar in Khyber Pakhtunkhwa.
  • B. Bu Tunnel
    Bu Tunnel is a Norwegian road tunnel that forms part of the access route to the Hardanger Bridge in Vestland county.
  • C. Vallavik Tunnel
    Vallavik Tunnel is a road tunnel in western Norway that forms part of the regional highway network connecting to the Hardanger Bridge.
  • D. Gudvanga Tunnel chosen
    Gudvanga Tunnel is a major road tunnel in western Norway, known as one of the country's longest tunnels and a key part of the E16 route through the fjord region.
  • E. Drogden Tunnel
    The Drogden Tunnel is an underwater road and rail tunnel beneath the Øresund Strait that forms the submerged section of the fixed link between Denmark and Sweden.
  • F. None of above.

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d87f1e49ac8190a311b54d32990576 completed April 10, 2026, 4:39 a.m.
NER Named-entity recognition batch_69e222dc6b1c8190a3d8a6451ed8b95a completed April 17, 2026, 12:09 p.m.
NED1 Entity disambiguation (via context triple) batch_6a00078db04081909f7e14b09687ba67 completed May 10, 2026, 4:20 a.m.
NEDg Description generation batch_6a00085d47788190b00967f4d1cf817d completed May 10, 2026, 4:23 a.m.
NED2 Entity disambiguation (via description) batch_6a0008dbeb988190bbfb590f945ace02 completed May 10, 2026, 4:26 a.m.
Created at: April 10, 2026, 5:02 a.m.