Triple
T1610997
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Git |
E34613
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | revision control software |
C227
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: revision control software Context triple: [Git, instanceOf, revision control software]
-
A.
SCM system
An SCM system (Supply Chain Management system) is a software platform that plans, executes, and monitors the end-to-end flow of goods, information, and finances across the supply chain to optimize efficiency, cost, and service levels.
-
B.
software
chosen
Software is a collection of programs, data, and instructions that tell a computer or digital device how to perform specific tasks or functions.
-
C.
free software project
A free software project is a collaboratively developed software initiative whose source code is openly available and may be used, modified, and redistributed under a license that guarantees these freedoms.
-
D.
software review and audit standard
A software review and audit standard is a formalized set of criteria, processes, and guidelines used to systematically evaluate software products and development practices for quality, compliance, security, and reliability.
-
E.
bazaar
A bazaar is a bustling marketplace where numerous vendors gather to sell a wide variety of goods, often in an open-air or covered setting.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885ffc5ec819091afa325d5f9611c |
completed | March 4, 2026, 7:20 p.m. |
Created at: March 4, 2026, 7:28 p.m.